Office building Cegeka & local government - Hasselt, Belgium
Period: 2008-2010
Architect: Holistic Architecture 50/5 - Hasselt (B)
Client: Province of Limburg
Used materials: 500 m² CorTen steel, thickness 4 mm for the cladding of the columns, 265 m² ceramic tiles (Alphaton supplied by Möding) and 7.300 meter of ceramic sun-screening.
The ceramic sun-screening was optimized so that ME Construct only needed 5 weeks on site to complete the whole erection. Therefore, they designed a special system of pre-assembled frames in aluminium combined with the ceramic elements and the safety railing. The CorTen steel was laser-cut in order to obtain a curved shape.
Turnover: € 1.560.000