• ME Construct and Artez won 2 public tenders, one for the prison of Merksplas and one for the roofrenovation of MuHKA in Antwerp (Museum for contemporary art).
• ME Construct's total order intake already passes the 12,5 milj. euro for 2012.
• ME Construct will do the complete building envelope for the GSK WN203 building in Waver.
Client is GlaxoSmithKline and PM Engineering (York - Ireland)

• ME Construct will do the cladding of the 300tons hall of Fabricom.
The existing hall (height 22,5 meter) will be raised by 10 meter. Total surface is 7.500 m2.
• ME Wielkopolska will do the cupper cladding of the University of Warszawa
More info and webcam on their website www.dobra55.uw.edu.pl
•ME Construct will install the ceramic tiles on the P8-building in Genk, designed by the famous architect Mario Botta.
General contractor is Jacobs I3 from Opglabbeek. In the building will also be a gallery of the worldfamous artist Koen Van Mechelen.

•ME Construct will install the acoustic cladding for the new Nato building in Evere with panels from Mice.
Works will start in May/June 2012.
•ME Construct will construct 10 steelhouses at the "Lac de l'eau d'heure".
Construction will start middle of the year. (see more ...)
•ME Construct will make the prototype wall cladding for the Tour D2 building in Paris.
•ME Construct is waterjetcutting different elements in cupper for the artist Stefan Bongaerts (www.stefanbongaerts.be).
They will be used as a trophee for 'De Leeuw van de export" by Flanders Investment and Trade.
• ME Wielkopolska's contract for the Poznan airport is extended with approx. 560.000 PLN for interior claddingworks.
• ME Wielkopolska won a contract for Aesculap Chifa, producer of medical surgeon instruments based in Nowy Tomysl.
Contractor is Aluwedo.
• After being rewarded with the contract for the outside cladding of the concert/eventshall Sportpaleis in Antwerp (B), ME Construt will also do the inner acoustic cladding.
• ME Construct will make a test-wall for KRC Genk.
The purpose is to test the strenght of the panels when hit by a football.
• ME Construct will execute the new building "Glassia" for the pharmaceutical company Baxter in Lessines together with Galère.
(The building is covered with sandwichpanels according to FM Global)
• ME Wielkopolska is executing different buildings on the Highway A4 for Strabag.
• ME Construct will watercut 240 m of railings in Corten-steel (30 mm) for Anmeco.
• ME Construct will produce more than 6500 acoustic cassettes and 1600 supporting columns for Mice.
(Sites in Angers - FR and Tunnel Leopold 3 in Brussels - B)
• ME Construct will do the Kalziproof of the building K3 (la Cour des Comptes Européenne) in Kirchberg, Luxemburg.
General contractor is CLE.
• ME Wielkopolska won a contract with Warbud for the cupper cladding of the University of Warszawa.
Architect is Kurylowicz, value of the contract 1,3 milj Zloty
• ME Polska won a contract to produce and install acoustical louvres for the University of Rzeszow.
• ME Polska and Ekol will do the cladding of the Olimpia hall in Belchatow.

• ME Construct will get an extension of their contract to do the cladding and cassettes for the Pole Star in Brussels (copy from the Northlight building).
Client is Belgometal from Wetteren.

• ME Construct will do the new wall cladding of the famous Sportpaleis in Antwerp (hall of concerts, sports, ...).
The wall cladding is in aluminium and will go on till 2013. Client is Antwerpse Bouwwerken.

• ME Construct will execute the roofedge of the new townhall of Houthalen-Helchteren in alucobond-cassettes (approx. 560 m) and also teh entrance building.
Furtheron, we will get an extension of the existing contract for the last part of the building (1.800 m2 of bigformat ceramic tiles). Value of the contracts is approx. 700.000 €.

• RFC signed a contract for the roofingworks (with Soprema) of the French Institut in Bukarest.
• ME Construct will execute the cladding for a building on the ESSO site in Antwerp.
• ME Construct will fabricate and install a first carwash-complex for Prowash.
• ME Construct will execute the "Red Line" for the new Alvo supermarket in Kortessem.
• ME Construct won the contract for the tunnelcovering for Glaxosmithkline (Wavre-B-).
General contractor is BPC.
• ME Construct will realise the roofcovering of the Lycée Français (Ukkel-B) for Lixon.
• Laser4metal will cover a villa in Opole with Cortensteel.
• ME Polska will do 2.700 m2 cladding on 2 silo's for Dalkia in Poznan.
• Laser4metal and ME Polska won a job in Bielsko-Biala.
(steelstructure and cladding)
• ME Construct will refurbish 2 sites for Carrefour (Diest and Burcht)
• ME Construct will supply and install corrugated steelsheets and flashings for a powerplant in Esch-sur-Alzette (Lux).
• ME Construct will cut with the waterjet panels in expanded metal for Métal Déployé.
• ME Construct will produce again wooden acoustic panels for Mice (Liège - B)
• ME Wielkopolska won the contract for the extension of the Poznan airport with Hochtief.
The works include Kalzip-roofs, alucobond cladding and steeldeck.
• ME Construct won several contracts for waterjetcutting, among others for Ellimetal Meeuwen (8 silos) and LAG Bree.
• The railway station in Kutno will be completely refurbished and reconstructed.
In the 4th quarter of 2011, Laser4metal will install an elevation of detached shelters of Corten steel. Projected elevation panels are perforated in rosettes of unusual shape, they are rooted to the ornaments on the historic buildign of station. The housing area, including headlining elevation will be about 850 m2.

• ME Polska will supply and install acoustic louvers for Airport Rzeszow. The used louvers are developped by ME Polska and AGH University of Science and technology. General contractor is Reconal.
• ME Polska will supply and install 7.000 m2 of wall cladding in the biggest cement plant of Europe, Cementownia Gorazdze.
• ME Construct won the contract for Maselis in Roeselare (B). Client is De Meestere part of Naessens Group.
• ME Construct will execute 2400 m2 of wallcladding in zinc for Platteau in Doornik.
• ME Construct will collaborate with Iemants on the new Louis Vuitton store in Paris.
• ME Construct will make a mock-up for the Shopping 1 in Genk
• ME Wielkopolska won 2 contracts : a Decathlon-shop in Kalisz, located130 km south-east form Poznan and a storage hall (4.065,7 m2) in Kornik, 17 km south east from Poznan.
•The joint-venture Vitiello-ME Construct-Liégeois won the public tender for the "Foire International de Liège"..
Last year, one of the buildings burned down and the client decided to rebuild a new one in a design & build formula. ME Construct will be responsable for the roof- and wallcladding, the smoke-extractors, the rainwaterdownpipes and the gates. Works start in 2 weeks and the complete new hall including HVAC, electricity, ... has to be finished before the 24th of October 2011 (total surface 6.600 m2)
• ME Construct will start the construction of the C-building (2900 m2 turn-key) in Bilzen.
See also major projects "Royerveld"
• ME Wielkopolska won the roof of the railway station in Wroclaw, together with general contractor Budimex.
• ME Construct will do the cladding/roofing for W.A.N. Gosselies.
General contractor is Lixon.
• Steelhouses part II.
After the Ecologis project in Charleroi (10 appartments), ME Construct will erect a "steelhouse" in Luxembug, completely with coldrolled profiles. Start will be in August.
• ME Wielkopolska won the contract for another Velux-building.
• ME Construct will install a steelconstruction including cladding on the Biekorfstraat 2 in Antwerp.
the former workshop of the famous artist Panamarenko.
see link
• ME Construct will do the complete kalzip-roof on the Weishaupt project in Brussels.
General contractor is Willemen. Later on, the Kalzip-roof will be covered with a green roof. Works will start mid 2011.
• ME Polska will do the roofworks of the new Terminal 2 in Rzeszow.
Works will start on May 2011 till August 2011 and the roof will be covered by 5150 m² of aluminium standing seam. The Rzeszow-Jasionka Airport features the second-longest runway in Poland and is the seventh busiest airport in Poland ( LOT and Ryanair are flying to this airport )

• ME Wielkopolska will execute a job in Gdansk with a HPL cladding.

• BelgoMetal and ME Construct will work together on the MG Tower in Gent.
This tower, with a height of 119 meter, will be the tallest building in Gent. ME Construct will install cassettes (highest level) and sinusoïdal wall cladding. Start is foreseen second part of this year.

• ME Construct signs a contract with Franki Liège for the extension of the airport terminal Charleroi Brussels South.
ME Construct also executed the cladding of the main terminal building. Used materials will be Metecno and Swisspanel. This site will be an enormous challenge both for the GC as for ME Construct, as the delays are very short. Works will start mid April and have to be completed before end of May 2011 (approx. 300.000 €)
• ME Construct will sign a contract with UCB for the complete envelop of their New Horizon Project in Braine-l'Alleud.
Design and engineering are made by Art & Build and NNE Pharmaplan from Danemark. The job includes the complete wall cladding, the roofing, secondary steel and the curtain wall. Works will start mid of June 2011.
• ME Construct will sign a contract with Lixon for the new storagehall of Chemviron, surface 20.000 m2.
Lixon and ME Construct already executed some renovation works and the office building for this client.
• ME Construct will produce a sculpture in stainless steel designed by the famous Belgian constructivist artist Mark Verstockt.
The sculpture, consists of 9 cubes and will have a height of 2,7 m. It will be installed at University Antwerp (UA) and is donated by some friends of Mark Verstockt in honour of his 80th birthday. Further information on this artist can be found on our news-page.
• ME Construct won the contract for Mandala, the new townhall of Houthalen-Helchteren.
General contractor is Mandala Construct, a joint venture between Kumpen and Cordeel. The design is by Holistic Architecture from Hasselt. In total there are almost 3.000 m2 ceramic tiles (1200x600 mm) in 8 different colours ranging from orange to dark red/brown and 1.400 m2 ceramic tiles (1500x150/200/300 mm) in sandcolour.

• ME Construct will sign a contract with Democo for PPS Tienen.
A renovation project in the centre of the city. The old buildings will be covered with horizontal cladding and aluminium flashings. Works will start in March.
• ME Construct signed a contract with Strabag Genk for the roofworks on the new Texaco-station in Heverlee.
• ME Construct will supply the cladding for a powerplant in Vasilikos, Cyprus.
The project is in hands of the Dutch NEM
• Laser4Metal signed a contract for supply and installation of about 40tonnes of steelconstruction for 2 officebuildings B4B in Krakow.
This contract also includes perforated trapezoïdal cladding, stainless steel cladding, aluminium panels and louvres.
• Laser4Metal received a contract for supply and installation of about 2200 m1 curved "Larson-panels" for the Millenium Hall in Rzeszow
• ME Wielkopolska will execute a 3200 m2 cupper wall for the cultural centrum in WrocŁaw
l
• Memorial in Palmiry, near Warsaw
ME Polska executed a project with special homemade and -designed Corten Steel cassettes with perforations like bulletholes. These cassettes are part of the cladding of the Memorial Museum, commemorating the massacre of Poles and Jews during World War II. Total covered area is 400 m2, architect is WXCA.


• ME Construct will renovate the walls of the distributioncenter of Lambrechts in Tongeren
Lambrechts is one of the biggest companies in Limburg, and they are taking care of the distribution of Supra and Spar. To centralize their distribution activities, they also bought the old Nova-buildings. The renovation will be with traditional trapezoïdal sheets and sandwichpanels. Execution started already.
• ME Construct signed the contract with Thomas & Piron for the cladding of their project 'Les Jardins de Luxembourg, bloc B' in Luxemburg
The cladding will be made with 'emalite' glazing (730 m²) on a stainless steel or aluminium sub-structure.
• ME Construct signed the contract for the roof of the new railway-station of Rotterdam (NL)
Together with Iemants steelconstructions. Our team will have to make the approx. 15.000 m² of composed roof with a stainless steel cover (thickness 0,5 mm, quality 316L). Works will start 2011. See next link: centraal station Rotterdam
• ME Wielkopolska signed the contract for the new Malta Project in Poznan (Poland)
The total roof area is 10.000 m² of insulated kalzip roof.



• ME Polska signed turnkey contract with KRAKBAU for the complete erection of a 2000 m² industrial building (Krakow, Poland)
• ME Polska won the Łodz contract (Poland)
They signed the contract with Hochtief-Warbud for the Interfalz standing seam roof (9000 m²).


• ME Wielkopolska signed the contract for the new airport in Wrocław (Poland)
The roof is about 20.000 m² of aluminium Kalzip standing seam. The general contractor is Hochtief Polska.



• ME Construct makes a jointventure with Vitiello (Battice, Belgium)
The joint venture will construct 10 appartments in cold rolled steelstructure (Type Sadef), covered with pannels from Stone Unit. Architect of this project is Paul Petit et Ass. (Charleroi, Belgium)
• ME Construct is rewarded with the VAMOSS contract (Hasselt, Belgium)
Before end of August, they will complete the 800 m² stainless steel roof, incluced all flashings. www.singelbeek.be


• ME Construct to produce about 300 wooden and more than 6000 alu pannels for MICE for the highway in Erpe-Mere (Belgium)

• ME Construct signed up with the JV BPC-Kumpen for the cladding and roofing of the GlaxoSmithKline WN 170 (Wavre, Belgium)
Turnover € 1.660.000 including curved kalzip, Simo louvres and steel trays.
• ME Construct signed a joint-venture with Belgometal (Wetteren, Belgium)
The JV Belgometal - ME Construct is rewarded with the contract of the 'Kop van Kessel-Lo' in Leuven (B), in front of the railway station. The first part is a small 4.800 m² of bended aluminium panels in a special coating from Euramax (NL). Architects are Search and Arte.

• ME Construct signed the contract for the new Law Courts building in Hasselt (Belgium)
The job consists of 800 m² of curved Kalzip painted aluminium and 516 m² of Duco louvers.