Gymnasium - Maldegem, Belgium
Period: 2009-2010
Architect: Van Acker & Partners Gent
Client: De Pret
Used materials: 2900 m² of insulated roof with Kalzip standing seam, convex and concave curved, with integrated solar panels (alu solar plus link naar de website !!), 1200 m² of insulated wall
Although the hard winter, ME Construct realised the cladding and roofing of the building in 4 months, to complete satisfaction of the architect, the contractor and the client. The pre-assembled solar pannels were also installed without any problem.
Turnover: € 555.000
Gymnasium Maldegem 3D (Download PDF)










