Foire de Liège - Liège, Belgium
Period: July 2011 - 24 October 2011
Architect: Victor Rensonnet
Client: Foire de Liège
Used materials: The joint venture Liègeois-Vitiello-MEC won the contest for the erection of 6700 m2 exhibition hall, after the old one burned down in 2010. It was a "design and build" (with eventually the possibility to take over the building in 5 years. The joint venture is responsable for the complete works, from foundation to technics. ME Construct will be responsable for the roof- and wallcladding, including shutterdoors, smoke exhausts, PVC roof, ...
Turnover: +/- € 2.300.000


















