Albert Tower - Charleroi, Belgium
Period: 2004-2005
Architect: Pierre John
Client: Joint venture Galère – Interbuild (B)
Used materials: 5.000 m² of zinc cassette panels (quartz zinc thickness 1 mm by Umicore)
The highest tower in Charleroi was ready for renovation. The architect decided to use a cladding with profiled zinc cassettes, modulated on 250 and 300 mm. In wintertime, ME Construct realized the cladding of this tall building (85 meter high).
Turnover: € 930.000







